December 8 2004 The weather has been dismal w

first_imgDecember 8, 2004 The weather has been dismal with a lot of rain, wonderful for drought relief, but tough on the outside construction crew. Nevertheless, construction proceeds at the back of the East Crescent complex. The form for the stairs is complete. This set of stairs will lead from the bridge at the second floor level to the third floor. [Photo & text: sa] … and a beautiful rock scape that may be landscaped with small clusters of native plants. [Photo & text: sa] This prepares for a walkway above the rocks … [Photo & text: sa] center_img Earth deposits in the bedrock between Unit 6 and 7 have been cleaned out and a wall form is in progress. [Photo & text: sa] last_img

Leave a Reply

Your email address will not be published. Required fields are marked *